First the joist hangers are screwed into position, after careful measuring so that they line up with each other properly. Then a glob of a super strong adhesive is put on the bottom of the joist hanger. Finally, the joists are lifted up and pushed down into the hanger and nailed. Our garage will require 13 joists to support the loft. Mark and his crew got 9 of them installed yesterday.
Tuesday, May 17, 2011
Step 17.1 - Joists
First the joist hangers are screwed into position, after careful measuring so that they line up with each other properly. Then a glob of a super strong adhesive is put on the bottom of the joist hanger. Finally, the joists are lifted up and pushed down into the hanger and nailed. Our garage will require 13 joists to support the loft. Mark and his crew got 9 of them installed yesterday.