The exterior of the house is nearly complete. At this point, a lot of details are getting finished both inside and outside the house.
I did a bunch more sanding of 4x4's for a trellis over the kitchen door on the back side of the house. Board and batten siding was also replaced there.
Mark and Al installed French doors on the office. They also installed craftsman style trim around the windows and doors.
Al shingled the post that holds up the trellis over the front walkway.
Al installed the railing for the garage loft.
Les installed the lanterns on either side of the garage door. Sheila and I installed the house numbers.
The house is really looking finished on the outside, but there is still work to be done on the inside.
No comments:
Post a Comment